Factory Direct from Wuzhou, China GRA Certified · MOQ 1 · OEM/ODM
The Wholesale JournalTrade desk2026-11-18

925 Sterling Silver Wholesale Lead Time Planning

Why your show calendar should set your production calendar

Every year I watch the same thing happen. A buyer books a booth at a January show, then places the silver order in December and asks for air freight. The factory can cut and polish fast, but nobody can compress a plating line or a stone-setting bench that is already booked. At HOLYCOME we run 925 sterling silver wholesale production on a 12 to 18 day cycle, and that number only holds when the order lands before the queue fills.

So the planning question is not "how long does production take." It is "when do I have to commit so the goods are in my hands, checked and priced, before the show floor opens." That is the frame I want to give you here, with the numbers we actually quote on the floor.

The three clocks running against a show order

Show planning gets messy because three separate timelines overlap. Buyers usually track one and forget the other two.

  • Sampling clock: 5 to 9 days for a custom silver sample, longer if the design needs new molds or a stone match.
  • Production clock: 12 to 18 days from deposit and approved sample, for both stock-reference and custom runs.
  • Transit clock: 5 to 8 days door-to-door on DDP, plus 2 to 3 days of customs paperwork slack in peak season.

Stack those and a custom order placed 30 days before a show is already tight. Placed 45 days out, it is comfortable. Placed 60 days out, you get room to re-order the pieces that sell at the show itself.

Q4 is not one peak, it is three

Buyers talk about "Q4 lead times" as if November is a single wall. In our scheduling it breaks into three waves, and each one stresses a different part of the line.

Wave one: late September to mid October

This is the restock wave. Retailers who sold through summer inventory reorder proven SKUs in 925 sterling silver. Because these are stock designs, MOQ is 1 pc and we can usually ship from existing production within the 12 to 18 day window without new tooling.

Wave two: mid October to mid November

Custom and private-label work lands here, and this is where the queue gets real. Setting benches and rhodium plating lines are the bottleneck, not casting. If your design needs a specific moissanite size or a two-tone finish, book the slot early. A 30 pcs custom MOQ is normal for us, and 30 pcs on one bench is a day of setting work, not an hour.

Wave three: late November to mid December

Air freight and express capacity tighten, and DDP transit can stretch from 5 to 8 days to 8 to 12 days. Nothing on the factory floor fixes that. The only fix is shipping earlier than you think you need to.

A working backward schedule that holds up

This is the table I send to buyers who ask how to time a Q4 or show order. It assumes DDP delivery and a standard custom run.

MilestoneTypical durationWhen to start (show on 15 Jan)Owner
Design confirmation and quote2 to 4 daysBy 20 NovBuyer plus factory
Sample approval5 to 9 daysBy 1 DecFactory
Deposit and production slot12 to 18 daysDeposit by 3 DecBuyer
Pre-ship AQL inspection1 to 2 daysAround 20 DecFactory QC
DDP transit5 to 8 daysShip by 26 DecFreight partner

Note the buffer: the goods land around 3 January, which leaves 12 days for your own receiving check, tagging and any reorder of fast movers. If a buyer compresses that buffer to zero, one delayed plating batch becomes a missing table at the show.

What we do differently on the floor

Our cost, speed and first-pass yield run roughly 20 percent better than typical trading companies, and the reason is boring: we own the bench. Stones come in and get checked at the door, the same QC team follows the piece through setting and polishing, and the pre-ship inspection uses AQL sampling rather than a look-over. There is no third party relaying your spec to a subcontractor and relaying excuses back.

Concretely, that means:

  • MOQ 1 pc on stock silver designs, 30 pcs on custom.
  • Three-stage QC: incoming stone check, in-process inspection, pre-ship AQL.
  • GRA and IGI certificates on lab-grown stones, issued per order.
  • T/T 30 percent deposit for production, PayPal accepted for samples.
  • DDP delivery in 5 to 8 days to US and EU addresses.
If a supplier cannot tell you which stage of QC caught the last defect you reported, they are guessing. Ask the question before you place the Q4 order, not after.

Hallmarks and paperwork that slow a shipment down

The 925 stamp itself is simple. What trips buyers up is documentation. US customs and EU importers both want the invoice to match the goods, and mismatched descriptions on silver plus lab-grown stone lines cause holds that eat your transit buffer.

We stamp 925 on every sterling piece and keep the stamp position consistent with the sample you approved, because a moved stamp is a rejected lot at some buyers' receiving docks. Certificate paperwork for GRA and IGI stones ships with the order rather than after it. Give your broker the correct HS codes and material descriptions at booking, not at arrival.

Sample orders as a lead time tool

Buyers often treat samples as a cost, not a schedule instrument. Use them the other way. A sample order in early September, paid by PayPal, tells you three things before Q4 pricing locks: whether the plating color matches your shelf, whether the stone grade reads correctly under your store lighting, and how fast the factory actually answers.

Then place the bulk order with a 30 percent T/T deposit against that approved sample. The sample becomes the reference standard for the pre-ship AQL check, which removes most arguments at receiving.

Frequently Asked Questions

What is the minimum order for 925 sterling silver wholesale?

Stock designs start at 1 pc, so you can test a style before committing. Custom designs carry a 30 pcs MOQ per SKU, which covers tooling and setting setup. Price is quoted per piece and moves with volume, stone grade and finish.

How long does production take if I order in October?

Standard production runs 12 to 18 days from deposit and sample approval, and that holds through most of October. From mid November the queue tightens, so book the slot before the deposit if your launch date is fixed.

Do you handle shipping and certificates for Q4 orders?

Yes. DDP delivery takes 5 to 8 days door-to-door, longer in the late December peak. GRA and IGI certificates are issued with the order, and we ship the paperwork with the goods so your broker is not chasing documents after arrival.

Send your show date and target SKU list to service@holycome.com or WhatsApp +86 133 7744 7107, and I will come back with a slot date, a per-piece quote and a sample timeline you can plan against. If you want to see the finish first, ask for a sample order and we will ship it before you commit to the bulk run.

Ends ■

Written by the Holycome manufacturing & quality team. Every figure and claim in this article comes from our own production floor in Wuzhou, China — in-house casting, stone setting and a three-pass quality inspection we have run since 2008.

Materials are tested for nickel, lead and cadmium release by SGS and CTT International; moissanite centre stones ship with their GRA warranty card and report. We also hold an independent SMETA / Sedex ethical-trade audit and a Hong Kong Customs AML registration.

Reviewed for accuracy by our quality team before publication. Last updated .

Frequently Asked Questions

Common questions about MOQ, samples, OEM/ODM, production lead time, pricing and payment.

What is the minimum order quantity for wholesale orders?
MOQ starts at 1 piece per style, and mixed styles are welcome for small wholesale batches. Larger private-label and bulk orders are quoted separately under a written agreement.
Can I order a sample before bulk production?
Yes. A sample or prototype is approved first, and bulk production only starts after your written confirmation. Sample lead time is typically 3 to 7 days.
Do you support OEM, ODM and private labeling?
Yes. We support custom designs, private molds, brand packaging and private-label branding for wholesale and retail partners. Send a reference photo or drawing and we return a 3D render and quote.
How long does production and shipping take?
Sampling takes 3 to 7 days, and bulk production is around 15 to 30 days depending on quantity, stone and metal requirements. Express and standard shipping options are quoted with the order.
How are prices and payment arranged?
Quotes are per piece, per carat or per gram based on stone, metal weight, setting and finish. We accept T/T, PayPal and Western Union; custom orders require an agreed deposit with the balance settled before shipment.