Bracelets Wholesale: lead times - HOLYCOME
A bracelet is quoted in days, but it is built through steps that run at different speeds. A sample moves through a bench one piece at a time: a link cut to length, a clasp fitted, the piece polished and plated once. Bulk production moves through queues set by how the materials arrive, so the same design can be promised in two weeks as a sample and eight as an order.
A bracelet is quoted in days, but it is built through steps that run at different speeds. A sample moves through a bench one piece at a time: a link cut to length, a clasp fitted, the piece polished and plated once. Bulk production moves through queues set by how the materials arrive, so the same design can be promised in two weeks as a sample and eight as an order.
The work is to find which event starts each clock and where the bulk lot waits.
Why a sample quoted in days becomes a bulk order quoted in weeks
The sample clock starts when the sheet is signed, not when the enquiry arrives
A sample is not run from the same queue as the order that follows. It is taken ahead of the run, built by a bench hand, and pushed through plating on its own. That is why a supplier can promise a sample in ten days while the bulk date stays open: the sample does not consume a casting run, a setting run or a plating load.
The bulk clock starts at a different event
The bulk clock begins when the sample is signed off and the deposit lands. Before that point the calibrated material has not been ordered, the drawing has not been released to the line, and the casting tree has not been scheduled. A date quoted before sign-off describes a process rather than a day, and it is the second event that the buyer should date a landing against.
The two clocks share a sequence, not a queue
Both paths pass through cutting, casting, setting and plating in the same order. What differs is the queue each step joins. A sample jumps the queue by being a single piece on a hand bench; the bulk order waits behind every order placed before it. Reading a lead time means asking which queue it was measured in.
The upstream step the two clocks often forget
Material selection sits between the two clocks
Bracelets consume calibrated components, and calibration happens after the order rather than before it. A supplier holding a spool can cut any length quickly, but a calibrated stone in a specific millimetre size is cut to order, and the cutting schedule follows the rough available that week rather than your position in line. That is the step most sample dates leave out.
A size change starts a new calibration lot
Calibrated material is sorted by measurement rather than by weight. A seat cut for 3.00 mm will not close on a 3.15 mm stone: the stone rides proud, the prong bites above the girdle and the load lands on the crown. A tolerance band of about 0.10 mm belongs in the order, and a second millimetre size is a second sorting lot.
Only three stations can be queued
Casting, setting and plating are stations with a queue you can join. Growing and cutting are not; they run to whatever the supplier is already working through. Asking to shorten a finishing queue changes nothing, while asking to consolidate sizes into one cutting lot changes a great deal.
Three constraints that only appear at bulk scale
A casting tree and a plating bath each have a floor
A sample of twenty pieces can be plated one at a time and cast in a single tree that barely fills. At bulk, the tree has to carry enough pieces to be worth firing and the bath has to hold a minimum load. A nominal quantity below either floor is what converts a quoted bulk date into a slip.
Setting runs in size batches
Stones are set in batches of one size, because each diameter change means a different drill and a different prong adjustment. A bracelet line with two stone sizes passes through the setting station twice, and a design that mixes three passes three times. The quantity in the order matters less than the number of size groups it contains.
Plating thickness is specified at the wear point
A flash of about 0.05 micron suits a display piece, 0.3 micron suits occasional wear, and 1.0 micron or more is the entry point for daily skin contact. A bath left to its own average reads thicker across the back of the links than at the tongue that opens against the wrist, so the target belongs to the surface that wears rather than to the batch.
| Field | Write it as | Failure it prevents | Clock it belongs to |
|---|---|---|---|
| Measured size | Millimetre figure with a tolerance band, about 0.10 mm | A seat that will not close on the next lot | Cutting |
| Colour and clarity | Scale named, reading taken against a sealed reference stone | A parcel that reads a grade step apart | Sorting |
| Link gauge and length | Gauge in millimetres, finished length end to end | A clasp that opens under a heavier charm | Casting |
| Plating target | Microns at the wear point, not a batch average | Wear showing through inside a season | Plating |
| Batch size | Units per casting tree and per plating load | A line that stalls below the bath floor | Both |
The two clocks explain why one supplier can give a confident sample date and a cautious production date on the same enquiry. The rest of the planning sits in the fields above, where a reorder either matches the first lot or becomes a second product.
Reading a quotation by the events that trigger it
A lead time is only meaningful once it is tied to an event. The same number means different things depending on whether it starts when the enquiry arrived, when the specification sheet was signed, or when the deposit cleared.
The trigger events worth naming
Ask which event opens the sample run, which opens the bulk run, and which inspection releases the balance. A supplier who answers all three is describing a process; one who answers only the first is quoting a number.
Why the enquiry date is not a trigger
An enquiry is a conversation, not a commitment. Work starts when the approved drawing, the metal specification and the deposit all exist, because until then the calibrated lot has not been ordered and no casting tree has been scheduled.
The fields a bracelet order has to freeze
The sample is the moment to close the fields a bulk lot will repeat. Each field is a measurement, so a second lot either matches the first or becomes a different product.
Sizing has to be written as a number
Wrist circumference runs about 150 to 165 mm for women and 175 to 190 mm for men, and stock lengths are usually 165, 178, 190 and 203 mm. Name the finished length and the ease added to the measured wrist, commonly 12 to 25 mm, because a line that sells well at 178 mm can hide a slow 165 mm.
Stone and plating fields
Calibrated stones are ordered by measured size with a tolerance band of about 0.10 mm, so a seat cut for 3.00 mm will not close on a 3.15 mm stone. Plating is stated in microns at the wear point: about 0.05 micron for a display piece, 0.3 micron for occasional wear, and 1.0 micron or more for daily skin contact.
| Field | What to record | Failure it prevents |
|---|---|---|
| Finished length | End-to-end millimetres plus ease | A line that fits one wrist size only |
| Chain or band | Gauge, width and surface | A heavier clasp quoted on a light chain |
| Stone size | Measured millimetres with tolerance | A seat that will not close |
| Plating | Microns at the wear point | Coverage gone inside a season |
| Batch size | Units per tree and per plating load | A run that stalls below the bath floor |
Where a delay piles up, and what the terms should say
Delay rarely comes from one slow step. It accumulates at three batch floors, because a run below any of them waits for other work to fill the gap.
The three floors to plan against
A casting tree has to reach a minimum weight before it is worth firing. A plating barrel has a load minimum, and twenty units plated at 0.3 micron is not a small version of two thousand; it is a different order of work. Setting adds a third floor, since each change of diameter means a change of burr and prong position. The number of size groups in an order matters more than the unit count.
Terms that decide who carries the risk
Write the lead time against its trigger event rather than the enquiry date, and tie the deposit to committed work: a calibrated lot, a new tool, a plating load. Release the balance against a verifiable document, such as a pre-shipment inspection report, rather than a shipping date. Currency and rate date belong on the same line, because an interbank fee on a small order can absorb the margin.
Order Terms for Wholesale Buyers
MOQ is 1 piece for stock styles and 30 pieces for custom work, and loose stones are sold by the carat. Sampling takes 7 to 10 days, and bulk production runs 15 to 25 days after the sample is approved. Pricing is quoted per piece or per carat depending on the item. Payment is T/T with a 30% deposit and the 70% balance before shipment, and PayPal is accepted for sample orders.
Frequently Asked Questions
Does a sample order count toward the bulk minimum?
Usually it does, but only when the sample is billed against the same specification and the credit is stated in writing.
Can two lengths share one minimum?
Ask whether they share a chain gauge and a plating load. If they do, they can be combined into one run.
How long should a quoted price be held?
Ask for a rate date and a settlement currency, since metal moves with the daily benchmark.
What ends a plating dispute?
A reading in microns taken at the wear point, agreed before the order rather than after the complaint.
Should every bracelet line be sampled first?
Only where the run introduces a new gauge, a new stone size or a new plating load.
Where a bracelet order goes next
The planning above turns on a small number of records. The knowledge base notes on chain gauges, stone measurements and plating readings set out how each field is logged, the about page describes the workshop and the plating and findings process behind a bulk run, and the product catalogue lists the gauges and lengths held in stock for a faster start.
Sources: Grading references: GIA gem education and GIA laboratory information.