k gold wholesale: First Order Landed Cost Math
Why Your First Quote Is Not Your Cost
Every week a buyer sends me a supplier quote and asks if the price is good. Nine times out of ten the number on that PDF is not what the goods will cost them. It is the ex-works price, before freight, before insurance, before duty, before the payment fee, and before the small percentage of pieces that get remade or refunded. I have spent twelve years on the QC floor, and I have watched first orders go sideways for reasons that had nothing to do with the metal and everything to do with arithmetic the buyer did not run.
This piece is the math. Not a buying guide, not a market overview. Just the line items you should put in a spreadsheet before you wire a deposit on k gold wholesale.
The Five Cost Buckets on Any K Gold Piece
Start by breaking a single unit into parts. Gold content, labor, stones, findings and packaging. If your supplier cannot split these out on request, that is already a signal.
Gold content
For 14K, the fine gold fraction is 58.5 percent. For 18K it is 75 percent. The alloy balance is silver, copper, sometimes palladium or zinc, and it costs far less per gram than the gold. So the metal line on your quote should move almost one to one with the spot price, weighted by karat. If gold moves three percent and your quote does not move, the supplier is either holding old stock or has built a cushion you are paying for.
Labor
Casting, filing, setting, polishing, plating, laser marking. On plain bands this is small. On a piece with forty prong-set stones, labor can pass the metal value. Ask for the setting count per piece before you compare two quotes, because a 0.9mm melee setting and a 3mm center setting are not the same minutes on the bench.
Stones
This is where most margin hides. Lab-grown diamond and moissanite pricing changes fast, and grading matters. We work with GRA certificates on moissanite and IGI on lab-grown diamond. A quote that says "lab diamond" with no grading body named is a quote you cannot compare to anything.
Findings and packaging
Clasps, posts, backs, and the pouch or box. Small per unit, but on a first order of 30 pieces it shows up. Ask whether the box is included or billed at 0.60 to 1.20 USD each.
A Worked Example: 30 Pieces of 14K, 0.8ct Total
Take a 14K white gold pendant with a lab-grown center and melee accents, 3.1 grams finished weight, IGI graded. Here is how I would lay it out for a first order of 30 pieces.
| Line | Basis | Per unit (USD) | 30 pcs (USD) |
|---|---|---|---|
| Gold content | 3.1g x 58.5% x spot | 118.00 | 3,540.00 |
| Labor and setting | 40 min bench time | 22.00 | 660.00 |
| Stones | 1 center + 18 melee, IGI | 96.00 | 2,880.00 |
| Findings, polish, marking | flat | 4.50 | 135.00 |
| Packaging | box and pouch | 0.90 | 27.00 |
| Factory subtotal | 241.40 | 7,242.00 |
That factory subtotal is the number on the quote. Now the part the quote never shows.
Getting It to Your Door: The Landed Cost Lines
Landed cost means the goods are in your hands, cleared, and you have paid every fee between the factory bench and your shelf.
- Freight: DDP delivery runs 5 to 8 days door to door on our lane. Budget it as a line, not a rounding error.
- Duty: the rate depends on your HS code and destination. Get it from your broker, in writing, before you commit.
- Payment fees: T/T 30 percent deposit plus balance before ship is standard. Your bank will take a wire fee at both ends. PayPal is available for samples and carries a percentage that eats small orders.
- Inspection and testing: if you plan to test the gold content on arrival, price the assay.
- Remake reserve: hold back 1 to 3 percent of order value. Not because you expect failure, but because a single re-set stone costs bench time and a courier.
Add those to the factory subtotal and you have a real number. On the example above, freight, duty, wire fees and a two percent reserve typically push a 7,242 USD order into the 8,300 to 8,700 USD range depending on the destination.
If a landed cost figure is within five percent of the ex-works quote, someone forgot a line. Freight and duty alone rarely come in under eight percent of goods value on jewelry.
Where a Factory Beats a Trading Company on This Math
Most quotes you collect come from trading companies. They buy from a bench, add a margin, and pass the paperwork along. That margin is real money on a first order.
We run our own floor, so our cost, speed and yield run about 20 percent better than a typical trading company on comparable work. The reason is boring: no middle layer taking a cut, and the same QC team that checks the stones also checks the finished piece, so less scrap and fewer remakes. On the example order, that gap is roughly 1,400 USD of factory subtotal, which is often the difference between a first order that pays for itself and one that does not.
What You Actually Get for the Deposit
Here is the operational side, so you can map it against the timeline in your spreadsheet.
- MOQ: 1 piece on stock items, 30 pieces on custom designs. First orders usually start in the stock lane to test the finish.
- Production: 12 to 18 days after deposit and artwork sign-off. Custom CAD adds a few days on the front end.
- QC: three stages. Incoming stone check on arrival at the bench, in-process check during setting and polishing, and a pre-ship AQL inspection before the box closes.
- Certificates: GRA for moissanite, IGI for lab-grown diamond. Confirm the certificate is issued per piece, not per parcel.
- Payment: T/T 30 percent deposit, balance against pre-ship inspection photos. PayPal for samples.
- Delivery: DDP, 5 to 8 days.
If you want to sanity-check any of this against a live quote, WhatsApp +86 133 7744 7107 or email service@holycome.com. Send the spec, not a photo of a competitor's listing.
Three Mistakes That Blow Up First-Order Budgets
Quoting one karat and ordering another
A 14K quote and an 18K quote are not close. The gold line alone moves by roughly 28 percent of the fine metal cost. Lock the karat in writing before you compare suppliers.
Ignoring the stone certificate cost
Grading is not free. Some quotes bundle it, some bill it per stone, some ship without it and let you discover that at customs or at your customer's return desk. Ask which body, which stones, and whether the paper travels with the piece.
Under-ordering the first run
Thirty pieces sounds like a lot until you split across sizes and two colorways. Then you have three pieces per SKU and no read on demand. On stock items the MOQ is 1 piece, so use that: order wide, deep only on the pieces you believe in.
Frequently Asked Questions
What is the minimum order for k gold wholesale?
One piece on stock designs and 30 pieces per design on custom work. Most first orders mix both, using stock to test finish quality and a small custom run to test your own design.
How long from deposit to delivery?
Production runs 12 to 18 days after deposit and sign-off, then DDP delivery adds 5 to 8 days. Custom CAD review sits before the clock starts, so build that into your launch date.
How is the price calculated?
Price is gold content at the current spot weighted by karat, plus labor, stones with GRA or IGI grading, findings and packaging. Ask for the split so you can see which line is moving when the market shifts.
Send me your spec sheet with karat, stone type, sizes and target quantity, and I will return a line-by-line landed cost estimate plus a sample quote so you can compare it against whatever else is on your desk.