Factory Direct from Wuzhou, China GRA Certified · MOQ 1 · OEM/ODM
The Wholesale JournalTrade desk2026-11-18

K Gold Wholesale: 6-Month Inventory vs Sell-Through Plan

Why Six Months Is the Right Planning Window

Most buyers I talk to plan k gold wholesale in either three-week panic orders or twelve-month spreadsheets. Neither works. Three weeks gives you no cushion for a restock, and twelve months locks cash into colors and carat ranges the market may have moved past.

Six months is the window where you can still react to a trend but you are not re-ordering every fortnight. It maps to two full production cycles, one certificate batch refresh, and roughly one full sell-through curve for a new SKU.

I have run QC on this floor for twelve years. The buyers who survive a season are not the ones with the biggest opening order. They are the ones who matched depth to velocity before the first shipment left.

The Two Numbers That Decide Everything

Before you pick a single SKU, get two figures on paper: your weekly unit sell-through per SKU, and your reorder lead time. Everything else in the plan is arithmetic on top of those.

For stock items at our factory, MOQ is 1 pc and production runs 12 to 18 days. For custom k gold settings, MOQ is 30 pcs. If your sell-through on a ring is 6 pcs a week and your reorder is 3 weeks door to door, a 20-pc depth order is already a stockout waiting to happen.

Working the depth math

  • Weekly velocity x reorder weeks = minimum safety depth
  • Add 20 percent for a promo or a marketplace spike
  • Cap any single SKU at 35 percent of that category's open-to-buy
  • Keep a 10 percent tail for test SKUs you have not proven yet

That last line matters more than people admit. If every dollar is committed to proven depth, you have no room to test the new shape that shows up in Q3.

Where Depth Quietly Kills Margin

Deep inventory is not free. It ties cash, it ages, and in k gold it also carries a style risk, because a chain width that sold in spring can sit cold by autumn.

The other cost is certificate and assay handling. Every piece that ships with GRA and IGI paperwork has a fixed handling cost, and that cost does not shrink when the piece sits in a warehouse for five months.

Depth you cannot turn in 90 days is not inventory. It is a loan you gave your supplier.

So the plan should split your open-to-buy into three buckets: core depth, seasonal depth, and test. Core gets the deepest cover, seasonal gets a shorter leash, test gets small and fast.

A Practical 6-Month Allocation Table

Here is how I would lay out a mid-size wholesale book across half a year, assuming you have already run the velocity math above. Percentages are of total open-to-buy, not of unit count.

BucketShare of budgetTypical depth coverReorder triggerRisk level
Core k gold basics50 percent8 to 10 weeks40 percent stock leftLow
Seasonal color and width25 percent5 to 6 weeks55 percent stock leftMedium
New shape tests15 percent3 to 4 weeksSell-through check at week 3High
Buffer for hot restock10 percentOn demandAny SKU over 8 pcs a weekFlexible

The reorder trigger column is the part most plans skip. Setting a stock-level trigger, not a calendar trigger, is what keeps a fast mover from going dark for two weeks.

Why our numbers run lean

We cut and set in-house, so stone check, casting, setting, and pre-ship inspection happen under one roof. That removes the handoff delays a trading company absorbs between three or four subcontractors.

In practice our cost, speed, and yield run about 20 percent better than a typical trading company on the same spec, because there is no margin stack between the bench and the buyer and no re-inspection loop when a sub-supplier ships short.

QC Stages That Protect a Deep Buy

Deep orders amplify defects. If you buy 400 pcs and 3 percent have a loose prong, that is twelve angry customers, not one. Three checkpoints handle it.

  • Incoming stone check: every moissanite and lab-grown stone graded and measured before it touches a setting
  • In-process check: prong seating, polish, and plating thickness checked at the bench, not after packing
  • Pre-ship AQL: sampling to AQL on the finished lot, with photos logged against your PO

Certificates ship with the lot: GRA for the stone, IGI where the buyer needs a lab report for the k gold piece. If your channel requires a specific certificate body, say so at PO stage, not after production.

Cash Flow and Payment Structure

Depth planning is a cash plan. The standard terms here are T/T with 30 percent deposit to start production, balance against the pre-ship inspection report. PayPal works for sample orders so you can approve the finish before committing to a lot.

Delivery is DDP, typically 5 to 8 days once the lot clears pre-ship. That short door-to-door window is exactly why a 6-month plan can carry less depth than a buyer sourcing on 30-day freight.

If you want to talk through a specific allocation, the floor line is WhatsApp +86 133 7744 7107 and the order desk is service@holycome.com.

Reading Sell-Through Without Fooling Yourself

Most buyers measure sell-through on revenue, which hides the problem. Measure it on units by SKU, weekly, and look at the shape of the curve rather than the total.

A SKU that sells 30 pcs in week one and 2 pcs in week six is not a 32-pc winner. It is a trend that already peaked, and your depth order should be shrinking, not repeating.

Set a review at week 3 and week 6 of each cycle. At week 3, decide whether the test bucket graduates to core. At week 6, decide whether the seasonal bucket gets cut or extended. That cadence is the whole plan.

Frequently Asked Questions

What is the MOQ for k gold wholesale orders?

Stock items start at 1 pc, so you can test a shape before committing depth. Custom k gold settings carry a 30 pc MOQ per design, and production runs 12 to 18 days after deposit.

How is pricing set for a 6-month plan?

Price is quoted per gram of k gold plus setting and stone cost, so it moves with metal. We lock the quote at PO stage and confirm again at pre-ship, and the deposit is 30 percent by T/T.

How fast can a restock reach my warehouse?

Stock reorders ship in 12 to 18 days of production, then 5 to 8 days DDP to your door. That total window is what your reorder trigger should be built around.

Send over your category split and target velocity and I will come back with a depth plan against our current stock list, plus samples if you want to handle the finish before the first lot.

Ends ■

Written by the Holycome manufacturing & quality team. Every figure and claim in this article comes from our own production floor in Wuzhou, China — in-house casting, stone setting and a three-pass quality inspection we have run since 2008.

Materials are tested for nickel, lead and cadmium release by SGS and CTT International; moissanite centre stones ship with their GRA warranty card and report. We also hold an independent SMETA / Sedex ethical-trade audit and a Hong Kong Customs AML registration.

Reviewed for accuracy by our quality team before publication. Last updated .

Frequently Asked Questions

Common questions about MOQ, samples, OEM/ODM, production lead time, pricing and payment.

What is the minimum order quantity for wholesale orders?
MOQ starts at 1 piece per style, and mixed styles are welcome for small wholesale batches. Larger private-label and bulk orders are quoted separately under a written agreement.
Can I order a sample before bulk production?
Yes. A sample or prototype is approved first, and bulk production only starts after your written confirmation. Sample lead time is typically 3 to 7 days.
Do you support OEM, ODM and private labeling?
Yes. We support custom designs, private molds, brand packaging and private-label branding for wholesale and retail partners. Send a reference photo or drawing and we return a 3D render and quote.
How long does production and shipping take?
Sampling takes 3 to 7 days, and bulk production is around 15 to 30 days depending on quantity, stone and metal requirements. Express and standard shipping options are quoted with the order.
How are prices and payment arranged?
Quotes are per piece, per carat or per gram based on stone, metal weight, setting and finish. We accept T/T, PayPal and Western Union; custom orders require an agreed deposit with the balance settled before shipment.
cta-row" style="margin-top:40px;"> Inquiry Custom Jewelry