Factory Direct from Wuzhou, China GRA Certified · MOQ 1 · OEM/ODM
The Wholesale JournalTrade desk2026-11-18

Lab Grown Diamond Wholesale Reorder Calendar

Why the calendar beats the price sheet

Most buyers open a lab grown diamond wholesale conversation by asking for a price per carat. Fair enough. But after twelve years on the floor, I can tell you the buyers who get burned are rarely the ones who paid two dollars too much. They are the ones who ordered melee in the last week of September and then paid air freight on a rush to fill a holiday counter.

Lab grown supply is not the bottleneck anymore. Scheduling is. Our rough comes from a handful of growers, our cutters run in fixed shifts, and our setters cannot be doubled overnight when three clients all wake up in the same week. So the useful question is not what a stone costs today, it is when your order needs to be on our bench.

What follows is the rhythm we actually plan against for US and EU trade accounts. Treat the dates as cutoffs, not suggestions.

The four demand waves you are buying into

Retail jewelry demand clusters into predictable windows, and wholesale orders arrive one step ahead of each. Once you see the pattern, the rest is arithmetic.

  • Valentine's wave: loose stones and finished pendants ordered December through mid-January, peaking the first two weeks of January.
  • Spring and Mother's Day wave: February into early April, heavy on studs, three-stone rings and tennis bracelets.
  • Bridal and graduation wave: April through June, dominated by 1.00 to 2.50 ct center stones with IGI certificates.
  • Holiday wave: the big one. Custom design approvals in July and August, bulk production September through early November.

Add a fifth, quieter stream that most spreadsheets miss: reorders. A style that sells out in week three of December will be reordered in January, and that buyer needs stock on hand, not a fresh production run.

Month-by-month reorder cutoffs

These are the dates by which a purchase order should be confirmed with deposit received, assuming standard sea or consolidated DDP movement to a US or EU warehouse. Rush options exist, but they cost.

WindowConfirm order byTypical mixDelivery target
Valentine'sDecember 50.50 to 1.00 ct studs, pendantsJanuary 10 to 25
Mother's DayFebruary 20Bracelets, three-stone, colored side stonesApril 10 to 30
Bridal and graduationApril 101.00 to 2.50 ct certified centersMay 20 to June 15
HolidayAugust 25Full range, deep SKU countOctober 15 to November 10

Note the asymmetry. Valentine's is a short, sharp window and late orders get expensive fast. Holiday is a long window but a wide one, so the risk is SKU breadth rather than volume. Plan them differently.

What actually takes the time

Production

Stock items ship from the shelf. Custom work, meaning your own CAD, your own setting, or a matched parcel sorted to specific color and clarity, runs 12 to 18 days in our shop after the deposit clears. That number is real, measured across thousands of orders, and it does not compress by asking twice.

Certification

Loose stones above roughly 0.30 ct go out with GRA cards as standard, and IGI for anything you intend to market as certified. IGI turnaround adds days, not weeks, but it is the single most common reason a shipment slips past a cutoff. If your holiday assortment includes certified centers, book the stones early and let the lab work in parallel with setting.

Shipping

DDP delivery to most US and EU addresses lands in 5 to 8 days once goods leave us. Customs is the variable, not the flight. Consolidated shipments clear faster than single-carton panic orders, which is another argument for ordering on the calendar rather than on the phone call.

Stock versus custom: two different clocks

We hold MOQ at 1 piece for in-stock designs and 30 pieces for custom production. That split matters for timing more than for price.

  • Stock at 1 pc is your reorder safety valve. A sold-out bestseller can be replaced in days, not weeks.
  • Custom at 30 pcs needs a longer runway because it consumes cutting and setting capacity that is already allocated.
  • Mixed orders are normal: a 30-piece custom run plus 20 pieces pulled from stock clears as one shipment.
  • Payment is T/T with 30% deposit to start, balance before dispatch. PayPal works for samples and small trials.

If you are testing a new style mid-season, order a sample on PayPal, sell it in your own store for two weeks, then commit to the custom run. That sequence has saved more buyers from dead inventory than any forecast model.

Where the 20 percent comes from

We run about 20 percent better than typical trading companies on cost, speed and yield, and the reason is boring: we are the factory. Stones are checked on arrival at our own bench, not at a middleman's office. There is no re-packing step, no second set of hands adding margin, and no waiting for someone else to answer a WhatsApp message about a parcel.

Quality control runs in three stages. Incoming stone check on color, clarity and measurements against the order sheet. In-process inspection during setting and polishing. Pre-ship AQL sampling on the finished lot, which is where most problems get caught before they become your customer service issue.

Late orders do not cost you the freight. They cost you the reorder, because a buyer who missed December does not come back in February with the same volume.

Signals that you should reorder now

Numbers lag. These floor-level signals lead.

  • Your own sell-through on 1.00 ct studs passes 60 percent before the season midpoint.
  • A rep asks for a size or clarity you do not stock, which means the demand is already downstream of you.
  • Your best-performing style has fewer than three weeks of cover at current velocity.
  • Rough prices on certified centers move up two weeks running, which usually precedes a retail restock push.
  • You are within 45 days of a cutoff in the table above and have not placed the PO.

Booking capacity, not just stones

One practical habit: tell us your seasonal plan in advance even if the PO is not ready. A rough SKU count and a target month lets us reserve cutting and setting slots, and reserved capacity is what separates a smooth November from a scramble. Buyers who share a rolling six-month view consistently get shorter quoted lead times than buyers who appear with an urgent request.

For anything time-sensitive, message WhatsApp +86 133 7744 7107 with your target in-hands date and we will tell you plainly whether it is achievable. For quotes, specs and certificate requests, service@holycome.com reaches the same floor.

Frequently Asked Questions

What is the minimum order for lab grown diamond wholesale?

One piece for designs we hold in stock, and 30 pieces for custom production runs. Mixed orders combining stock and custom are quoted as a single shipment, and samples can be paid by PayPal before you commit to the custom quantity.

How long does production and delivery take?

Custom production runs 12 to 18 days after the 30 percent T/T deposit clears, with in-stock items shipping sooner. DDP delivery then takes 5 to 8 days to most US and EU addresses, and IGI certification can add a few days to the schedule.

How is price quoted, and does volume change it?

Price is quoted per carat by shape, size range, color and clarity, with certified goods priced separately from melee parcels. Volume tiers start at the 30-piece custom threshold, and because we cut in-house our cost and yield typically run about 20 percent better than trading companies.

Send us your seasonal assortment list with target in-hands dates and we will come back with a quote, certificate options and a realistic production slot. If you would rather see the goods first, request a sample parcel and we will ship it DDP so you can judge the make before the season starts.

Ends ■

Written by the Holycome manufacturing & quality team. Every figure and claim in this article comes from our own production floor in Wuzhou, China — in-house casting, stone setting and a three-pass quality inspection we have run since 2008.

Materials are tested for nickel, lead and cadmium release by SGS and CTT International; moissanite centre stones ship with their GRA warranty card and report. We also hold an independent SMETA / Sedex ethical-trade audit and a Hong Kong Customs AML registration.

Reviewed for accuracy by our quality team before publication. Last updated .

Frequently Asked Questions

Common questions about MOQ, samples, OEM/ODM, production lead time, pricing and payment.

What is the minimum order quantity for wholesale orders?
MOQ starts at 1 piece per style, and mixed styles are welcome for small wholesale batches. Larger private-label and bulk orders are quoted separately under a written agreement.
Can I order a sample before bulk production?
Yes. A sample or prototype is approved first, and bulk production only starts after your written confirmation. Sample lead time is typically 3 to 7 days.
Do you support OEM, ODM and private labeling?
Yes. We support custom designs, private molds, brand packaging and private-label branding for wholesale and retail partners. Send a reference photo or drawing and we return a 3D render and quote.
How long does production and shipping take?
Sampling takes 3 to 7 days, and bulk production is around 15 to 30 days depending on quantity, stone and metal requirements. Express and standard shipping options are quoted with the order.
How are prices and payment arranged?
Quotes are per piece, per carat or per gram based on stone, metal weight, setting and finish. We accept T/T, PayPal and Western Union; custom orders require an agreed deposit with the balance settled before shipment.
cta-row" style="margin-top:40px;"> Inquiry Custom Jewelry