Factory Direct from Wuzhou, China GRA Certified · MOQ 1 · OEM/ODM
The Wholesale JournalTrade desk2026-11-23

Lab Grown Gemstones Wholesale: shipping & DDP - HOLYCOME

DDP is a delivery term rather than a shipping method, and the difference decides most of what follows an order leaving the factory. Under Delivered Duty Paid the seller carries the goods to a named place and clears the import duties, so a quote reads as final only once the destination address sits next to it.

DDP is a delivery term rather than a shipping method, and the difference decides most of what follows an order leaving the factory. Under Delivered Duty Paid the seller carries the goods to a named place and clears the import duties, so a quote reads as final only once the destination address sits next to it.

A lab grown gemstone order adds a layer, because the stones travel inside a finished piece and the calibrated sizes, certificate and packaging all have to survive the same journey.

Why DDP is a delivery term rather than a shipping mode

The named place changes the price

DDP to port and DDP to your warehouse are two prices, not one. The first ends where the container is unloaded and leaves inland haulage, unloading and any appointment at your dock to you; the second includes them. A buyer comparing two suppliers is often comparing two places, which is why the destination belongs in the same line as the term rather than assumed again.

The importer of record has to exist somewhere

DDP puts the import clearance on the seller, which means someone must act as importer of record in the destination country. A courier can take that role, but only where its service covers the goods and the value. Where it does not, the shipment waits while a broker is appointed, and the delay lands on a schedule built around a delivery date.

Rough diamonds move under the Kimberley Process; a lab grown parcel does not, and is declared inside the jewellery category, so the two do not share paperwork.

A jewellery declaration is not a parcel declaration

Gemstone jewellery is declared by material and by metal, and the description on the airway bill is what customs reads first. A line reading fashion jewellery against a shipment of 925 silver pieces set with stones invites a hold, because the metal proportion and the stone both sit above the point where duty treatment changes.

The invoice, packing list and certificate should name the same materials; where they differ by one character, the difference is usually a certificate copied from another lot.

What the mode choice actually changes

Air, express and sea remove different risks

Air freight moves on scheduled capacity and is billed on chargeable weight, the greater of actual and volumetric weight. The standard air conversion is 167 kg per cubic metre, so a carton of light, bulky gift boxes is billed on the space it takes rather than on what it weighs. Express courier clears through its own network and is priced per parcel with a fuel surcharge, which suits small sample lots.

Sea freight suits volume and accepts a transit in weeks. The choice is about which risk the schedule can absorb.

Transit time is quoted as a band, not a date

A transit figure covers movement, not clearance, and clearance is where jewellery shipments lose days. A quote of ten to fourteen days usually means that much transport plus an unknown customs window. The fields that make the band usable are the mode, the named place, the party clearing import and the document set, because a date without those four is a description rather than a commitment.

Insurance follows the terms, not the value

Cover should match the term. Under DDP the seller insures to the named place, so the buyer's protection ends where delivery ends. Institute Cargo Clauses A cover the widest set of risks; B and C cover narrower ones, and a policy written on C will not answer a claim for theft. The certificate should state the clause, the insured value and the point at which cover ends.

Where the landed cost is assembled line by line

Landed cost is a sum of lines, and a single DDP figure hides which of them moved. Writing the lines out lets a buyer see what a change of mode would save.

LineWhat it coversWhat to record
FreightMovement by mode, billed on chargeable weightMode, volumetric conversion, transit band
Duty and taxImport duty and VAT or sales tax at destinationTariff code, rate, who clears
ClearanceBroker fee, entry fee and any examinationImporter of record, document set
InlandHaulage, unloading and appointment at the dockNamed place, delivery window
InsuranceCover to the named placeClause, insured value, cover end point

The last kilometre is a line, not a rounding

Inland haulage, unloading and a delivery appointment each cost something, and a warehouse that receives only on weekday mornings turns a Saturday arrival into a Monday one. Where the term ends at the port, these belong to the buyer and should be priced before the order rather than discovered on the invoice.

Currency and the rate date sit next to the price

A landed cost quoted in one currency and settled in another carries a rate that has to be dated. Naming the rate date and the settlement currency in the same line removes an argument that otherwise surfaces weeks later, when the invoice arrives at a different rate than the quote.

What a DDP quote should name

A usable DDP figure names the destination, the mode, the transit band, the party clearing import, the document set and the insurance clause. Those six fields turn a price into something a buyer can compare, and Part 2 carries them into the arrival check and the reorder.

A DDP shipment is checked against the quote, not a tracking number, because the term already placed clearing and duty with the seller. The arrival check confirms four things: that the goods match the order, that the documents agree, that duty was paid at the declared value, and that delivery reached the place the quote named.

What a buyer checks when a DDP lot arrives

Documents before boxes

Documents are read first because they carry the value. The invoice, packing list, certificate and transport document should name the same goods and quantity, and a certificate number differing by one character from the invoice usually belongs to another lot. The material wording has to agree across every document, using laboratory-grown, laboratory-created or created rather than real, genuine or natural.

The stones and the settings that hold them

Once the paper agrees, the goods are measured against the order. Weight is read on a scale, since one carat is 200 milligrams, and a calibrated parcel should sit inside the band on the order, commonly about 0.10 mm; a seat opened for 6.50 mm will not close on a 6.65 mm stone. Colour and clarity are read under a lamp at 5,000 to 6,500 K against a sealed reference stone.

The place of delivery, not only the date

The term named a place, and the delivery should end there. A quote written as DDP to the port leaves inland haulage, unloading and a delivery appointment with the buyer, so the arrival check separates what the term covered from what it did not.

Where a shipping or clearance failure actually occurs

Declared value and duty paid

Duty is assessed on the declared value, so an undervalued line can hold the shipment in clearance when the figure does not match the invoice. A generic description invites a delay while a specific one clears, and a shipment held in clearance is usually a document problem rather than a transport problem.

Transit damage and the packing that allowed it

Damage in transit points back to the case that carried the goods. A parcel arriving with stones pressed on their tables, or claws bent inward, tells you the cavity was sized from the outer box rather than the pieces. The insurance clause decides who pays: institute cargo clauses A cover most risks, B and C are narrower, and a policy on C will not answer a theft claim.

The last mile a port-only quote leaves behind

The final leg is a cost line rather than a rounding error. Inland haulage, unloading and delivery appointments each carry a price, and a receiver with fixed hours adds a weekend to any arrival after it closes.

What has to hold across a reorder

A second shipment repeats the first only when the fields that travelled with it are written down. The table pairs each field with what to record and the failure it prevents.

FieldWhat to recordFailure it prevents
Term and placeDDP plus the exact delivery addressA landed cost that ends at the port
Document setInvoice, packing list, certificate and transport document matched to one numberA shipment held in clearance over a mismatch
Declared valueInvoice value and the duty that followsAn assessment that disagrees with the invoice
Insurance clauseThe clause letter and what it coversA loss with no route to a claim
Currency and rate dateSettlement currency against a named rate dayAn invoice at a different rate than the quote

What moves between shipments is the freight rate, the fuel surcharge and the alloy base. What should not move is the measured stone size inside its band, the alloy proportion and the plating thickness in microns at the wear point, recorded against a sealed reference stone. For items in prolonged skin contact, the nickel release limit under EN 1811 remains 0.5 microgram per square centimetre per week, and a report naming the components tested belongs with the shipping file.

Order Terms for Wholesale Buyers

MOQ is 1 piece for stock styles and 30 pieces for custom work, and loose stones are sold by the carat. Sampling takes 7 to 10 days, and bulk production runs 15 to 25 days after the sample is approved. Pricing is quoted per piece or per carat depending on the item. Payment is T/T with a 30% deposit and the 70% balance before shipment, and PayPal is accepted for sample orders.

Frequently Asked Questions

Does DDP remove the need for an arrival check?

No. DDP moves duty and clearing to the seller, but the buyer still measures the goods against the order and confirms delivery reached the named place.

Which shipping mode suits a gemstone order?

Air freight is chosen for speed and billed on chargeable weight, the greater of actual and volumetric weight, converted at 167 kilograms per cubic metre. Sea freight suits volume where a voyage of weeks is acceptable.

Can a port-only quote be compared with a door quote?

Not until the port quote is priced through to the buyer's address. Adding inland haulage, unloading, a delivery appointment and the insurance clause makes both figures comparable.

What ends a dispute over damage in transit?

A comparison rather than an argument: the packing specification, the cavity dimensions, the insurance clause and photographs of the goods as unpacked.

How long should shipping records be kept?

At least as long as the goods may be claimed against. The document set, the duty paid, the rate date and the reference stone reading are what a second order needs.

Where these fields lead next

See the current range and delivery options at our products page, learn how the goods are made and packed at the about page, and find the specification notes behind these fields at the knowledge base.

Sources: Grading references: GIA gem education and GIA laboratory information.

Ends ■

Written by the Holycome manufacturing & quality team. Every figure and claim in this article comes from our own production floor in Wuzhou, China — in-house casting, stone setting and a three-pass quality inspection we have run since 2008.

Materials are tested for nickel, lead and cadmium release by SGS and CTT International; moissanite centre stones ship with their GRA warranty card and report. We also hold an independent SMETA / Sedex ethical-trade audit and a Hong Kong Customs AML registration.

Reviewed for accuracy by our quality team before publication. Last updated .

Frequently Asked Questions

Common questions about MOQ, samples, OEM/ODM, production lead time, pricing and payment.

What is the minimum order quantity for wholesale orders?
MOQ starts at 1 piece per style, and mixed styles are welcome for small wholesale batches. Larger private-label and bulk orders are quoted separately under a written agreement.
Can I order a sample before bulk production?
Yes. A sample or prototype is approved first, and bulk production only starts after your written confirmation. Sample lead time is typically 3 to 7 days.
Do you support OEM, ODM and private labeling?
Yes. We support custom designs, private molds, brand packaging and private-label branding for wholesale and retail partners. Send a reference photo or drawing and we return a 3D render and quote.
How long does production and shipping take?
Sampling takes 3 to 7 days, and bulk production is around 15 to 30 days depending on quantity, stone and metal requirements. Express and standard shipping options are quoted with the order.
How are prices and payment arranged?
Quotes are per piece, per carat or per gram based on stone, metal weight, setting and finish. We accept T/T, PayPal and Western Union; custom orders require an agreed deposit with the balance settled before shipment.