Loose Moissanite Wholesale: 6-Month Stock Plan
Why the first 90 days decide the last 90
Most buyers I talk to want to solve the whole six months in one purchase order. That is the wrong move. The first 90 days tell you which sizes and grades actually leave your shelf, and the last 90 days are where you either reorder fast or sit on dead weight.
I run incoming stone checks at our Guangzhou floor, and I see the same pattern every quarter: buyers who stock 40% of their budget in slow movers on day one end up discounting in month five to free cash. The plan below is what I would do if it were my own money.
Loose moissanite wholesale is a width game before it is a depth game. Get the size and color spread right, then add depth only on the SKUs that prove themselves.
Set your depth by sell-through rate, not by gut
Before you commit a single parcel, pull your last two quarters of sales data and sort by SKU. Anything turning more than 1.5 times per quarter deserves stock cover of at least 60 days. Anything under 0.5 times per quarter should be stocked thin or not at all.
Here is the rough banding I use when a buyer asks me to sanity-check a plan:
| Sell-through band | Quarterly turns | Stock cover | Reorder trigger |
|---|---|---|---|
| Fast | Above 1.5x | 60 to 75 days | At 30 days of cover left |
| Steady | 0.8x to 1.5x | 45 to 60 days | At 21 days of cover left |
| Slow | 0.3x to 0.8x | 30 days, mixed sizes | Only after a confirmed order |
| Dead | Under 0.3x | Sample quantity only | Do not reorder |
Notice the reorder triggers sit well above zero. That buffer is the whole point of a six-month plan. If you wait until you are out, your customer waits 12 to 18 days for production, and that is a lost sale more often than a patient one.
Where depth actually pays you back
Depth in loose moissanite wholesale only earns its keep in a few places. Round brilliant in 1.0mm to 3.0mm, D-E-F color, VVS, is the one SKU family where I would hold real depth. It is the melee that goes into pave bands, halos and tennis settings, and it moves in volume.
Second place is the 5.0mm to 7.0mm round in G-H, VS. That is your entry stud and solitaire size, and it is the size buyers reorder most often once a design proves out.
- Hold depth on melee rounds under 3.0mm in DEF VVS, because they are consumed by the carat across many settings.
- Hold moderate depth on 5.0mm to 7.0mm rounds in GH VS, the workhorse solitaire sizes.
- Keep fancies like pear, oval and emerald thin until a customer commits to a design.
- Treat fancy colors as sample stock only in the first 90 days, then deepen the two or three that sell.
- Never let a slow-moving fancy color absorb more than 5% of your opening budget.
Because we cut in-house and hold raw rough on site, our cost and speed on a reorder runs about 20% better than a typical trading company that has to source from a third-party cutter before it can confirm your date. That margin is what lets a buyer carry a slightly deeper melee position without the cash strain.
Build the six months in three blocks
Block one: days 1 to 60, narrow and shallow
Open with a broad size and color spread at low depth per SKU. This is your read on demand, not your profit block. Keep total spend modest and let the data come in.
Stock items ship at MOQ 1 pc, so you can test a size without buying a parcel. Custom cuts run at MOQ 30 pcs, and that is where you go once a SKU proves itself.
Block two: days 61 to 120, deepen the winners
By now you know your turns. Put the second block of budget into the top four or five SKUs and nothing else. This is where the 12 to 18 day production window matters, because you are reordering against live demand rather than guessing.
Block three: days 121 to 180, protect the cash
The last block is about not over-buying into a soft season. Cut depth on anything that slipped a band, and hold the savings for a fast reorder when a customer lands a program.
Depth without a reorder trigger is just inventory you are financing for your customer.
What to check on every incoming parcel
Depth is worthless if the stones do not match the spec you sold. Every parcel that lands on our floor goes through three QC stages: an incoming stone check on arrival, an in-process check during any setting or sorting work, and a pre-ship AQL inspection before it is packed.
For loose moissanite wholesale orders, we ship with GRA certificates as standard, and IGI certification is available on request for the larger and higher-value stones. Ask for the certificate body in writing on the PO, because not every supplier states it clearly.
- Confirm the color grade on a master stone set, not on a photo.
- Check millimeter tolerance on melee, since a 0.1mm drift breaks a pave layout.
- Verify the certificate body and the number of stones covered per document.
- Spot-check polish and girdle finish on a random 10% pull from each parcel.
Payment terms are T/T with 30% deposit and balance before shipment, and PayPal works for sample orders. We ship DDP, and delivery typically lands in 5 to 8 days once the parcel leaves us.
A worked example on a modest budget
Say a buyer has USD 20,000 for the half year. I would put roughly 35% into block one as a wide, shallow spread, 45% into block two on proven SKUs, and hold 20% untouched for opportunistic reorders. That last fifth is what saves you when a customer walks in with a program in month four.
If you want to talk through your own numbers, message the floor directly on WhatsApp at +86 133 7744 7107 or email service@holycome.com. We will tell you honestly where your depth is too heavy.
Frequently Asked Questions
What is the minimum order for loose moissanite wholesale?
Stock items start at MOQ 1 pc, so you can sample a size before committing. Custom cuts and non-standard specs run at MOQ 30 pcs. Lead time is 12 to 18 days for production after deposit.
How is pricing set for a six-month plan?
Price is quoted per carat or per piece, based on size, color grade, clarity and certificate body. Because we cut in-house, our cost and yield run about 20% better than a typical trading company, and we quote against your confirmed spec sheet.
Can I split one order across three delivery blocks?
Yes. Many buyers place one PO with staged release dates across the six months. We hold the balance and ship each block on your call, with DDP delivery in 5 to 8 days after dispatch.
Send over your size and grade breakdown for the next six months and we will come back with a stock-versus-reorder split, current pricing and a sample parcel you can inspect before you commit. Ask for a quote or a sample pack and we will get it on the bench this week.