Factory Direct from Wuzhou, China GRA Certified · MOQ 1 · OEM/ODM
The Wholesale JournalTrade desk2026-11-18

Moissanite Wholesale Payment Terms & Freight Guide

Why the money conversation comes before the stone conversation

Most first-time buyers spend three weeks comparing stone photos, then lose a month on the payment side because nobody explained the sequence. I have watched this happen from the QC bench for twelve years. The order is fine. The stone is fine. The wire is late, the deposit is split wrong, and freight gets booked against a document nobody signed.

So let me put the commercial terms in front of you plainly, in the order they actually happen. This is not a pitch. It is the paperwork flow I see every week at our factory in Wuzhou, and the places where new importers typically trip.

The three-stage payment structure, and why it exists

Our standard term for moissanite wholesale orders is T/T with a 30% deposit before production, balance before shipment. That split is not arbitrary. The deposit buys rough, books the cutting line, and covers the casting or setting slot. The balance releases the goods after pre-ship inspection.

For sample orders and small stock buys, PayPal is fine. It costs us a fee, and we would rather absorb a small fee than ask a first-time buyer to wire money to an account they have never used. Once you have run two or three orders and know how we work, T/T becomes cheaper for both sides.

  • Stock items, no customization: MOQ 1 pc, PayPal or T/T, ships within a few days.
  • Custom design or custom stone size: MOQ 30 pcs per SKU, 30% T/T deposit, 12-18 day production.
  • Repeat orders with an established account: we can discuss net terms, but only after a track record.
  • Balance is due against pre-ship photos and the AQL report, not against a promise.

One caution. If a supplier asks for 100% upfront on a first custom order and cannot show you an inspection report template, that is a signal, not a shortcut. Deposits protect both sides; full prepayment protects only one.

What the deposit actually pays for

Buyers sometimes assume the deposit is a goodwill gesture. It is working capital with a specific job. Moissanite rough is purchased in batches, and a 30 pcs custom run of 6.5mm round brilliant in a specific color grade means we commit to that rough before your balance arrives.

The same deposit locks your slot in the production calendar. Our line runs 12-18 days for custom work, and slots fill in sequence. A deposit dated today holds a slot this month; a deposit dated in three weeks does not.

Where the 20% advantage shows up

We are a factory, not a trading company, and that changes the cost structure in ways you can measure. There is no middle layer marking up the rough, no second warehouse, no relay of emails between you and the person who actually touches the stone. On comparable specs, our cost, speed and yield run roughly 20% better than typical trading companies, and the reason is boring: fewer hands, one QC team, one shipping dock.

Freight terms explained without the jargon

DDP means delivered duty paid. The price you agree includes freight, customs clearance and duty, and the parcel arrives at your door. For most US and EU buyers under 50 kg, DDP is the least stressful option and our default. Delivery runs 5-8 days after dispatch.

FOB and EXW exist if you have your own forwarder and want to consolidate. They are cheaper on paper and more work in practice, because you own the customs entry. If this is your first import, take DDP. Learn the paperwork on someone else's account.

TermWho handles customsTypical transitBest for
DDPSupplier5-8 days door to doorFirst orders, parcels under 50 kg
FOBBuyerDepends on forwarderBuyers with an existing broker
EXWBuyerDepends on forwarderConsolidated multi-supplier shipments

Declared value matters more than most new importers expect. We declare accurately against the commercial invoice, because a seized parcel costs more than the duty saved. If your accountant needs a specific invoice format, tell us before dispatch, not after.

Where the QC checkpoints sit relative to payment

Payment milestones should map to inspection milestones. Ours run in three stages. Incoming stone check happens when rough or finished stones arrive at our bench: color, cut, and measurement against the order sheet. In-process inspection covers setting, polishing and plating. Pre-ship inspection is a documented AQL sampling before anything is boxed.

You get the pre-ship report and photos before the balance is due. That sequencing is deliberate. You should never pay a balance on goods you have not seen in a report.

  • GRA certificate accompanies moissanite pieces as standard.
  • IGI certification is available on request for lab-grown diamond and higher-value moissanite items.
  • Report numbers are matched to the physical parcel before sealing.
  • Any AQL failure is reworked or replaced before the balance request goes out.
If a supplier's inspection report appears only after full payment, the report is decoration, not quality control.

Currency, bank charges and the small costs nobody quotes

We quote in USD by default. Wire transfers carry intermediary bank fees, and on orders under a few thousand dollars those fees can look large as a percentage. Ask your bank for the full landed cost of the transfer before you compare two suppliers on price alone.

PayPal sample payments carry a fee on our side, which we absorb on small orders because it keeps the first transaction simple. For repeat wholesale volume, T/T is cheaper for everyone. If you are working through an agent or a sourcing platform, confirm who pays the platform fee before the deposit leaves your account.

Red flags I would want a buyer to notice

Twelve years on the floor gives you a certain instinct. These are the patterns that precede trouble, in my experience.

  • A request for full prepayment on a first custom order with no inspection report offered.
  • Payment instructions that change to a different account name mid-order.
  • No written production timeline, only a verbal promise of fast delivery.
  • Refusal to state the certificate body, or vague answers about GRA versus IGI.
  • Pressure to skip pre-ship photos to save a day.

None of these are automatically fraud. All of them are reasons to slow down and ask one more question in writing.

Frequently Asked Questions

What is the minimum order for moissanite wholesale?

Stock items start at MOQ 1 pc, so you can test quality with a single piece. Custom designs and custom stone specifications run at MOQ 30 pcs per SKU, with 12-18 day production after deposit.

How long from deposit to delivery?

Custom production takes 12-18 days, then DDP delivery runs 5-8 days to most US and EU addresses. Stock orders skip the production window and ship within a few days of payment.

How is price calculated, and what does it include?

Price is quoted per piece or per carat equivalent, based on stone size, color grade, metal type and setting complexity. DDP quotes include freight, duty and clearance; FOB and EXW quotes exclude them.

If you want the numbers for your specific mix, send your stone sizes, metal and quantity to service@holycome.com or message WhatsApp +86 133 7744 7107. We will return a quote with the deposit amount, production window and freight term written out, and we can ship a sample first so you see the stone before committing to a wholesale run.

Ends ■

Written by the Holycome manufacturing & quality team. Every figure and claim in this article comes from our own production floor in Wuzhou, China — in-house casting, stone setting and a three-pass quality inspection we have run since 2008.

Materials are tested for nickel, lead and cadmium release by SGS and CTT International; moissanite centre stones ship with their GRA warranty card and report. We also hold an independent SMETA / Sedex ethical-trade audit and a Hong Kong Customs AML registration.

Reviewed for accuracy by our quality team before publication. Last updated .

Frequently Asked Questions

Common questions about MOQ, samples, OEM/ODM, production lead time, pricing and payment.

What is the minimum order quantity for wholesale orders?
MOQ starts at 1 piece per style, and mixed styles are welcome for small wholesale batches. Larger private-label and bulk orders are quoted separately under a written agreement.
Can I order a sample before bulk production?
Yes. A sample or prototype is approved first, and bulk production only starts after your written confirmation. Sample lead time is typically 3 to 7 days.
Do you support OEM, ODM and private labeling?
Yes. We support custom designs, private molds, brand packaging and private-label branding for wholesale and retail partners. Send a reference photo or drawing and we return a 3D render and quote.
How long does production and shipping take?
Sampling takes 3 to 7 days, and bulk production is around 15 to 30 days depending on quantity, stone and metal requirements. Express and standard shipping options are quoted with the order.
How are prices and payment arranged?
Quotes are per piece, per carat or per gram based on stone, metal weight, setting and finish. We accept T/T, PayPal and Western Union; custom orders require an agreed deposit with the balance settled before shipment.
cta-row" style="margin-top:40px;"> Inquiry Custom Jewelry