Factory Direct from Wuzhou, China GRA Certified · MOQ 1 · OEM/ODM
The Wholesale JournalTrade desk2026-11-18

Necklaces Wholesale: First-Order Landed Cost Math

Why the quoted unit price is never your landed cost

Every week a buyer sends me a target price for necklaces wholesale and asks if we can hit it. I always answer the same way: I can quote you a unit price in ten minutes, but that number is not what the goods cost you. What matters is the landed figure — the money that leaves your account from the moment you approve the sample until the carton sits in your warehouse.

I have spent twelve years on the factory floor doing incoming stone checks and pre-ship inspections, and the pattern is consistent. First-time buyers budget for the unit price plus a rough shipping guess, then get surprised by duty, certificate handling, and a payment fee they never saw coming. This article walks through the arithmetic on a realistic first order so you can build a proper cost sheet before you commit.

The four line items inside a necklaces wholesale unit price

When we quote a 925 silver pendant necklace with a 6.5mm moissanite stone, the price is not one number invented at a desk. It breaks into metal, stone, labor, and finishing. On a typical first order the metal is the largest share for silver pieces, the stone is the largest share for larger solitaire pendants, and labor plus finishing together usually sit between 15 and 25 percent.

This matters because it tells you where negotiation actually works. Asking for a 20 percent discount across the board is unrealistic. Asking us to switch from a hand-set prong to a standard basket setting, or to reduce the chain from 45cm to 40cm, is a real cost lever.

  • Metal: silver weight in grams multiplied by the day's spot price plus a fabrication allowance
  • Stone: moissanite or lab-grown diamond priced per carat by size, color and clarity grade
  • Labor: setting, soldering, chain attachment, polishing
  • Finishing: rhodium plating, e-coat, laser engraving, tag and clasp assembly
  • Packaging: pouch, box, GRA card, and outer carton
Cost elementTypical share of unit priceWhat moves itBuyer control
Metal30-45%Silver spot, chain gauge, total gram weightMedium
Stone20-40%Carat size, color grade, clarity gradeHigh
Labor and setting10-20%Setting style, number of stones per pieceHigh
Finishing and plating5-10%Rhodium thickness, engraving, e-coatMedium
Packaging and documents3-6%Box tier, certificate body, card printingHigh

Worked example: 300 units across three SKUs

Say you are launching with three necklace designs: a 6.5mm moissanite solitaire pendant, a bezel-set station necklace, and a plain 925 silver chain with a small lab-grown accent. You want 100 of each. Because all three are stock molds for us, the MOQ is 1 pc per style and you are not paying a tooling charge.

Assume an average unit price of USD 14.50 across the mix. That gives a goods value of USD 4,350. Now the layers that buyers forget:

  • Inland freight to the export port and export clearance: roughly USD 180 on this volume
  • Air freight, DDP, 5-8 days door to door: about USD 420 for around 45 kg chargeable
  • Duty into the US or EU: typically 2.5-6.5 percent of goods value depending on HS code and material
  • Certificate handling: GRA cards included, IGI on request at a per-stone fee
  • Payment cost: T/T 30 percent deposit, balance before ship, bank fees around USD 35

Add that up and the landed cost lands near USD 5,150, or about USD 17.17 per piece. That is your real break-even before marketing. If your retail plan assumes a 14.50 cost, you are pricing against a number that does not exist.

Buyers who model landed cost before the first PO consistently reorder. Buyers who model unit price alone usually cut the second order or switch suppliers chasing a discount that was never there.

Where our numbers run about 20 percent better

I get asked why our cost, speed and yield tend to come in roughly 20 percent ahead of typical trading companies on the same spec. The reason is structural, not a discount trick. We cut and set in the same building, so there is no intermediate margin, no second set of handling, and no re-inspection when goods change hands.

Practically, that means fewer stones lost in transit between workshops, faster rework when an in-process check catches a loose prong, and a shorter queue before your order enters production. Trading companies quote from a spreadsheet; we quote from the bench. That difference shows up in your landed number.

Lead time and QC: what your money is actually buying

Stock items ship in 3-5 days. Custom designs run 12-18 days in production, plus 2-3 days for the pre-ship inspection and documents. Plan your first order around 20 working days from deposit to dispatch, then add the DDP transit window.

Quality control happens in three stages. Incoming stone check verifies carat weight, color and clarity against the order sheet before anything is set. In-process inspection happens after setting and again after plating. Pre-ship inspection uses AQL sampling on the finished cartons — clasp tension, chain pull test, plating thickness spot check, stone security, and laser mark legibility.

Every moissanite piece ships with a GRA card. Lab-grown diamond pieces can carry IGI certification on request, priced per stone. If your channel needs those documents, say so at quote stage, not after production, because retrofitting certificates means pulling pieces back to the bench.

Payment terms and how to de-risk order one

The standard structure is T/T with 30 percent deposit and the balance before shipment. For samples, PayPal is fine and keeps the first transaction small. If you want to test three designs before committing to 300 units, order one piece of each as a sample, approve the finish in your hand, then release the bulk PO.

Two habits keep first orders clean. First, confirm the exact gram weight and stone size in writing on the PO, because a 0.3g difference per piece across 300 units is real money. Second, book the inspection window into your launch calendar. Rushing the pre-ship stage is the single most common cause of a bad first container.

Frequently Asked Questions

What is the MOQ for a first necklaces wholesale order?

Stock designs start at 1 pc per style, so you can sample freely. Custom designs require 30 pcs per style because the mold and setting jig have to be built. Price is quoted per piece and drops at 100, 300 and 500 unit tiers.

How long does production and delivery take?

Stock ships in 3-5 days. Custom runs 12-18 days in production plus 2-3 days for pre-ship inspection. DDP delivery is 5-8 days door to door, so a custom first order is typically about four weeks end to end.

How is the price calculated and what certificates are included?

Price is built from metal weight at spot, stone cost by grade, labor and finishing, quoted per piece FOB or DDP. GRA cards are included on moissanite. IGI certification for lab-grown diamond is available at an added per-stone fee.

Send your three target designs, stone size and expected first quantity to service@holycome.com or WhatsApp +86 133 7744 7107, and I will return a landed cost sheet with freight, duty and certificate lines broken out — not just a unit price. Sample orders are welcome before you commit to bulk.

Ends ■

Written by the Holycome manufacturing & quality team. Every figure and claim in this article comes from our own production floor in Wuzhou, China — in-house casting, stone setting and a three-pass quality inspection we have run since 2008.

Materials are tested for nickel, lead and cadmium release by SGS and CTT International; moissanite centre stones ship with their GRA warranty card and report. We also hold an independent SMETA / Sedex ethical-trade audit and a Hong Kong Customs AML registration.

Reviewed for accuracy by our quality team before publication. Last updated .

Frequently Asked Questions

Common questions about MOQ, samples, OEM/ODM, production lead time, pricing and payment.

What is the minimum order quantity for wholesale orders?
MOQ starts at 1 piece per style, and mixed styles are welcome for small wholesale batches. Larger private-label and bulk orders are quoted separately under a written agreement.
Can I order a sample before bulk production?
Yes. A sample or prototype is approved first, and bulk production only starts after your written confirmation. Sample lead time is typically 3 to 7 days.
Do you support OEM, ODM and private labeling?
Yes. We support custom designs, private molds, brand packaging and private-label branding for wholesale and retail partners. Send a reference photo or drawing and we return a 3D render and quote.
How long does production and shipping take?
Sampling takes 3 to 7 days, and bulk production is around 15 to 30 days depending on quantity, stone and metal requirements. Express and standard shipping options are quoted with the order.
How are prices and payment arranged?
Quotes are per piece, per carat or per gram based on stone, metal weight, setting and finish. We accept T/T, PayPal and Western Union; custom orders require an agreed deposit with the balance settled before shipment.
cta-row" style="margin-top:40px;"> Inquiry Custom Jewelry