Factory Direct from Wuzhou, China GRA Certified · MOQ 1 · OEM/ODM
The Wholesale JournalTrade desk2026-11-23

925 Sterling Silver Wholesale: payment terms - HOLYCOME

Sterling silver is bought by weight and sold by piece, and that gap is where deposit terms get written. A buyer orders a fixed number of rings or chains, but the supplier commits metal, tooling and a plating load before the first unit exists. The 925 alloy is 92.5 percent silver, softer than gold, and the bright finish that keeps it selling is a batch step.

Sterling silver is bought by weight and sold by piece, and that gap is where deposit terms get written. A buyer orders a fixed number of rings or chains, but the supplier commits metal, tooling and a plating load before the first unit exists. The 925 alloy is 92.5 percent silver, softer than gold, and the bright finish that keeps it selling is a batch step.

The work is not picking a deposit percentage; it is matching each payment to the event it funds.

Why a sterling silver order carries a deposit at all

Three purchases happen before anything ships, each priced on a different basis.

Silver is priced against a daily benchmark

Silver trades on a daily fixing, so a quote is only valid for the day it names. A supplier holding twenty kilograms of alloy carries price risk from the moment the order is accepted, so the metal line is funded first. The rate applies to finished weight after polishing and setting, not to a model file, because filing and tumbling remove a measurable share of the metal.

Every casting tree has a minimum fill

Casting is priced in trees and flasks, not units. A tree has to be heavy enough to fill the flask properly, so twenty light pieces can leave most of a flask empty while still paying for the metal and the cycle. A small first order therefore carries a process cost that a larger run spreads across many more pieces.

Plating and finishing run in batches

A plating bath is loaded to a minimum volume, so twenty pieces and two thousand pieces are not two sizes of the same job. Write plating thickness in microns at the wear point: about 0.05 micron suits display and photography, 0.3 micron suits occasional wear, and 1.0 micron or more is the entry point for daily skin contact.

What the deposit should actually cover

A deposit is not a share of the invoice; it is payment for work already committed. Splitting it by line makes the terms easier to argue.

The metal line

Metal cannot be un-bought once the alloy is poured or the sheet is rolled, and it tracks the daily benchmark, so the deposit here locks a rate rather than fixing the finished price. Ask for the rate date and the settlement currency on the same line, because a benchmark that moves between deposit and balance changes metal cost even when the design has not moved.

The tooling and casting line

New designs need a master, a mould and a flask cycle. Those costs sit in the order whether one hundred pieces sell or none, which is why a first order with new tooling often carries a larger deposit, while a repeat order cut from existing tooling can sit nearer a third of the value.

The finishing and plating line

Finishing happens last and can still be reworked, so it usually attaches to the balance rather than the deposit. Writing the plating target in microns and the surface in grit keeps this step measurable: a satin finish is often around 240 grit, a finer matte around 320 grit, and two batches that share a name but differ in grit or brush direction will not match under the same light.

Terms that decide who carries the risk before delivery

Once the deposit is set, three clauses decide the rest of the exposure.

Release the balance against a document

The balance should be tied to something a buyer can verify, such as a pre-shipment inspection report or a copy of the bill of lading, rather than to a shipping date the supplier controls alone. A fixed date rewards dispatch rather than care, and on silver a bent post or a loose clasp is the failure seen most often.

Name the currency and the rate date

Two suppliers can quote the same figure in two currencies and settle at different amounts once an intermediary bank takes its fee. Putting the currency, the pricing date and who pays transfer charges on one line avoids a shortfall that eats margin on small orders.

Identify which Incoterm you are quoting

Trade terms allocate cost and risk, and on silver the gap between delivery to a port and delivery to a warehouse is a real number, since import duty, customs brokerage and the final leg are separate costs. A DDP figure that does not name a delivery address is not a finished price.

Items worn against the skin also fall under regional rules: the EU limit for nickel release under EN 1811 is 0.5 microgram per square centimetre per week, and because that is a release rate an alloy containing nickel can still pass while a thin plating can fail.

StructureDepositBalance triggerWhere it fits
T/T instalmentsFirst instalment on orderBefore shipmentRepeat lines with an existing mould
Inspection-linkedSmaller depositOn an approved pre-shipment reportFirst orders with new tooling
Letter of creditFunded through the bankAgainst compliant documentsLarger lots and unfamiliar suppliers
EscrowFunded on orderOn confirmed deliveryNew lines with high unit value

Each line above is a measurement rather than a description, which is what lets a second order match the first. Part 2 sets out the price list fields that follow from these terms, and the parts of a schedule that can be negotiated one line at a time.

A payment schedule tells a buyer when money moves. A price list tells the buyer what each figure is measured against. Drafted separately, a deposit that looks proportionate can still fund a line that was never agreed, and a reorder returns at a different number with nothing on the page to explain it.

What each price line has to be measured against

The metal line moves with the daily silver price, so 925 sterling silver, at 92.5 percent silver, is quoted per gram at a rate that holds for a stated date. The multiplier applies to the weight after setting and polishing rather than to the weight in the model file.

Stone, labour and finishing

Stone is priced per piece in millimetres, labour per operation, and finishing per batch in microns at the wear point. A halo of forty stones is forty setting actions rather than one, and a flash of about 0.05 micron is a different operation from a 1.0 micron coating built for daily skin contact.

LinePriced byWhat the order has to record
MetalPer gram at the daily ratePurity, finished weight, rate date
StonePer piece, in millimetresMeasured size, tolerance band, colour scale
LabourPer operationSetting style, stone count, sizes in the run
FinishingPer batch, in microns at the wear pointMicrons, grit and brush direction
TermsPer orderCurrency, rate date, Incoterm, bank charges

How each deposit maps to a cost that has already started

A deposit is credible when it traces to work in progress rather than to a percentage of an invoice.

Metal committed at a daily price

Alloy bought at the daily rate cannot be returned at that rate once it has been cast or rolled, so the deposit locks a price rather than a finished item.

Tooling and the casting run

A new design needs a master, a mould and a casting cycle, and those costs sit in the order whether or not it sells. A first order with new tooling therefore carries a larger deposit than a reorder of a line that already exists.

Plating and surface work

Plating and finishing can be redone, so they usually sit against the balance. Satin at about 240 grit and a finer matte at about 320 grit will not match under light even when both are called satin.

What stays fixed and what is renegotiated on a reorder

The design, the mould and the setting pattern should hold across a reorder. What moves are the metal rate, the rough the calibrated stone was cut from, and the currency at settlement.

Frozen fields

Measured stone size with its tolerance band, seat depth against a measured pavilion, colour scale with a sealed reference stone per band, and microns at the wear point should not move. A seat cut for 6.50 millimetres will not close on a 6.65 millimetre stone, and the pressure moves to the crown.

Fields that move on their own

A price list states a rate date and a settlement currency instead of a single number because the metal rate and the rough supply move without anyone deciding to change them. A wider colour band can often be filled from one cutting lot, so it costs less than a second size that starts a second calibration batch.

Order Terms for Wholesale Buyers

MOQ is 1 piece for stock styles and 30 pieces for custom work, and loose stones are sold by the carat. Sampling takes 7 to 10 days, and bulk production runs 15 to 25 days after the sample is approved. Pricing is quoted per piece or per carat depending on the item. Payment is T/T with a 30% deposit and the 70% balance before shipment, and PayPal is accepted for sample orders.

Frequently Asked Questions

Should a deposit follow the invoice or the committed cost?

Committed cost is the more honest basis, since a percentage can underfund a first order carrying new tooling.

Can the balance be released against something other than a shipping date?

It can. A pre-shipment inspection report or a bill of lading copy gives the buyer a verifiable event rather than a date the supplier controls.

How long should a quoted rate hold?

As long as the list says. A stated rate date turns a moving metal price into something the buyer can plan around.

Does a sample fee come off the bulk order?

Usually, above a stated value, which belongs on the same page as the minimum.

What settles a dispute over plating wear?

A reading in microns taken at the wear point, on the clasp or hinge that takes daily friction, compared against the figure on the order. A batch average does not settle it.

Where to take a sterling silver order next

Payment terms only hold while the specification behind them holds. A buyer who keeps purity, measured size, microns at the wear point and the rate date on every line can compare two suppliers on the same basis.

The reference notes behind these figures sit in the knowledge base on silver purity, plating microns and casting floors. The workshop practice behind the casting and plating lines is described on the manufacturing and quality page, and the current range with its sizes, finishes and minimums is listed in the product catalogue.

For items in prolonged skin contact, the EU nickel release limit under EN 1811 is 0.5 microgram per square centimetre per week, and the test report should travel with the order.

Sources: Grading references: GIA gem education and GIA laboratory information.

Ends ■

Written by the Holycome manufacturing & quality team. Every figure and claim in this article comes from our own production floor in Wuzhou, China — in-house casting, stone setting and a three-pass quality inspection we have run since 2008.

Materials are tested for nickel, lead and cadmium release by SGS and CTT International; moissanite centre stones ship with their GRA warranty card and report. We also hold an independent SMETA / Sedex ethical-trade audit and a Hong Kong Customs AML registration.

Reviewed for accuracy by our quality team before publication. Last updated .

Frequently Asked Questions

Common questions about MOQ, samples, OEM/ODM, production lead time, pricing and payment.

What is the minimum order quantity for wholesale orders?
MOQ starts at 1 piece per style, and mixed styles are welcome for small wholesale batches. Larger private-label and bulk orders are quoted separately under a written agreement.
Can I order a sample before bulk production?
Yes. A sample or prototype is approved first, and bulk production only starts after your written confirmation. Sample lead time is typically 3 to 7 days.
Do you support OEM, ODM and private labeling?
Yes. We support custom designs, private molds, brand packaging and private-label branding for wholesale and retail partners. Send a reference photo or drawing and we return a 3D render and quote.
How long does production and shipping take?
Sampling takes 3 to 7 days, and bulk production is around 15 to 30 days depending on quantity, stone and metal requirements. Express and standard shipping options are quoted with the order.
How are prices and payment arranged?
Quotes are per piece, per carat or per gram based on stone, metal weight, setting and finish. We accept T/T, PayPal and Western Union; custom orders require an agreed deposit with the balance settled before shipment.