Size Guide: Where Comes From: The Supply Chain - HOLYCOME
A Size Guide price carries four supply steps: alloy, stone, casting and finishing. Knowing which step a supplier controls explains both the price and the risk.
A Size Guide price carries four supply steps: alloy, stone, casting and finishing. Knowing which step a supplier controls explains both the price and the risk.
Step one and two: alloy and stone
Alloy comes from a mill, usually in sheet, grain or tube. Stones come from cutting centers, and the cutting quality is set there, not at the setting bench. On Size Guide, a cheap stone usually means a cheaper cut, not a cheaper rough.
Ask which mill and which cutting source. The answer tells you what can change without notice.
Set the reorder point from sell-through and lead time, not from the MOQ. Stock cover is a calculation, not a feeling.
Step three: casting
Casting is either in-house or subcontracted. In-house means control over the alloy mix and the queue; subcontracted means a shared queue and a longer lead time in peak.
On Size Guide, the casting arrangement is the single best predictor of peak-season reliability.
| Step | Who controls | Risk if opaque |
|---|---|---|
| Alloy | Mill | Purity drift |
| Stone | Cutting center | Grade change |
| Casting | Factory or sub | Peak delay |
| Finishing | In-house or shop | Color variation |
| Plating | Plating shop | Thickness drift |
Read the table as a checklist rather than a recommendation. The right row depends on the price band, the wear pattern and the channel you sell into.
Seal the approved sample in a bag with the PO number. It is the only physical record that settles a claim without an argument.
Step four: finishing and plating
Plating can be in-house or a plating shop. A plating shop serves many clients and its bath chemistry drifts; that drift is the source of color variation between lots.
Ask for a color sample per lot, and for the bath maintenance record if the volume justifies it.
Reading the chain in a quote
A quote that names the mill, the stone source, the casting arrangement and the plating shop is a quote you can audit. A quote that names none of them is a price with no chain behind it.
On Size Guide, that transparency is worth more than a few percent on the unit price.
The channel decides the tolerance. A boutique forgives a loupe mark; a marketplace does not. Build the inspection standard to the strictest channel you sell.
What to check before the order
Run the five checks below in order. The first two protect the money, the last three protect the launch date.
- Ask which mill supplies the alloy.
- Ask where the stones are cut.
- Ask whether casting is in-house.
- Ask for a color sample per lot.
- Audit the chain, not only the price.
If a supplier cannot answer three of the five, treat the quote as a starting point rather than a plan. Ask again in writing and keep the answer with the PO.
Frequently Asked Questions
Why does Size Guide price vary between factories?
Different alloy sources, cutting quality and casting arrangements. The chain explains the price more than the labor rate does.
Does in-house casting matter?
In peak season, yes. It decides whether your order holds its slot.
Why does color drift between lots?
Usually plating bath chemistry. A sample per lot catches it early.
Can I audit a supply chain?
At the level of names: mill, cutting source, casting, plating shop. Four answers make a quote auditable.
What is the biggest hidden risk?
A stone source change without notice. The lot looks similar and grades differently.
How do I know a supplier is reliable?
Two clean repeat lots and two on-time shipments. Before that it is a sample, not a supplier.
Send the Size Guide spec. We return the four-step supply chain with the mill, stone source, casting and plating arrangement named. See the full range at HOLYCOME.
None of this is exotic. It is a document, a measurement and a date, repeated until it becomes a process.