Factory Direct from Wuzhou, China GRA Certified · MOQ 1 · OEM/ODM
The Wholesale JournalTrade desk2026-11-18

Synthetic Stones Wholesale: 6-Month Stock Plan

Why the six-month window decides your margin

Most buyers I talk to plan synthetic stones wholesale purchases in one of two broken ways. Either they buy a shallow spread of everything and run dry by week nine, or they load up on depth in two shapes and sit on dead stock until the next season. Both cost money, just in different columns.

Six months is the right planning horizon because it matches how long a moissanite or lab-grown program actually takes to mature: one restock cycle, one certificate batch, one shipping lane. Get that window right and the rest of the year mostly maintains itself.

I've been running QC on this floor for twelve years, so what follows is how we actually see buyers succeed and fail, not theory from a sales deck.

The two numbers that matter: depth and sell-through

Depth is how many pieces per SKU you can ship from stock the day a reorder lands. Sell-through is the percentage of what you bought in a period that actually left your shelf. They pull in opposite directions, and the tension is the whole job.

High depth protects you from stockouts but ties up cash and raises your exposure if a shape cools off. High sell-through feels great on a report but often means you were too thin and lost sales you never saw. The healthy target for a 6-month synthetic stones wholesale plan sits around 65 to 75 percent sell-through with enough depth to cover your best three SKUs for at least six weeks of demand.

Depth is not the same as breadth

Breadth is SKU count. Depth is units per SKU. A buyer carrying 120 SKUs at 2 pieces each has almost no depth and will reorder constantly. A buyer carrying 30 SKUs at 15 pieces each has real depth and can ride out a shipping delay without telling customers to wait.

For most trade buyers we recommend a 3-tier structure: deep on the top 10 percent of SKUs, moderate on the next 30 percent, and sample-level on the long tail.

A six-month stocking model that holds up

Here is the shape of plan I'd put in front of a buyer opening or resetting a moissanite program. It assumes you already know your top shapes and sizes from prior sell-through data; if you don't, run one quarter of thin buying first and let the data build.

  • Months 1-2: buy breadth, 1 to 3 pieces per SKU across 60 to 90 SKUs, mostly rounds and ovals in 0.5 to 2 ct equivalent. This is a discovery buy.
  • Months 2-3: read the data, cut the bottom 40 percent of SKUs, and place your first depth order on the winners.
  • Months 3-4: hold depth at roughly six weeks of forecast demand on winners, keep the tail at sample level.
  • Months 4-5: second depth order, shifted toward whatever is climbing, with a small test tranche for new shapes.
  • Month 6: freeze new SKUs, protect depth only, and use the last weeks to plan the next window.

Notice the sequence: breadth first, depth second. Buyers who invert it end up with deep inventory in the wrong shapes, which is the single most common mistake I see on incoming inspections.

What our floor can actually hold for you

Depth only works if the factory behind it can restock fast. This is where the trading-company model breaks down and a factory model wins. Our stock MOQ is 1 piece, so you can test a shape without committing to a carton. Custom production MOQ is 30 pieces per SKU, and custom runs take 12 to 18 days.

Because we cut and set in-house instead of brokering through a middleman, our cost, speed, and yield run about 20 percent better than typical trading companies. The reason is simple: fewer hands, no margin stacking, and QC catches rejects before they ship instead of after.

Every order runs a three-stage QC: incoming stone check on rough and finished goods, in-process inspection during setting and polishing, and a pre-ship AQL sampling pass against the agreed spec. Certificates come as GRA plus IGI where the grade requires it.

Payment, shipping, and the practical details

Terms are T/T with 30 percent deposit, balance against documents, and PayPal for samples. DDP delivery lands in 5 to 8 days once goods are packed, which matters when you're holding thin depth and need a fast top-up.

For anything urgent, WhatsApp +86 133 7744 7107 gets a faster answer than email. Quotes and spec sheets go through service@holycome.com.

Reading sell-through without fooling yourself

Most sell-through reports lie a little, and usually for the same reasons. Here are the traps I'd flag before you build a plan on top of your numbers.

SignalWhat it usually meansAction
Sell-through above 90 percentYou were too thin and lost salesRaise depth on those SKUs
Sell-through below 40 percentWrong shape, size, or price bandCut or reprice, don't reorder
Zero movement but steady inquiriesPrice or certificate mismatchCheck grade and cert before cutting
Returns clustered on one SKUSetting or color consistency issueRequest stone-level QC photos
Reorder frequency rising fastReal demand, thin coverConvert to depth order now

The trap most buyers fall into is treating high sell-through as pure success. If you sold out in five weeks on a six-month plan, you didn't win, you underbought. The other trap is averaging across all SKUs, which hides both the stars and the dead weight.

Track sell-through by SKU tier, not by total. A blended number tells you almost nothing about what to reorder.

Depth decisions that protect cash

You don't need to fund six months of inventory up front. Staged depth orders tied to real sell-through data keep cash moving while still protecting your top SKUs.

A workable rule: never hold more than eight weeks of forecast demand in any single SKU unless it's a proven repeat item with stable pricing. For proven items, twelve weeks is reasonable if your restock lead time is two to three weeks, which ours is on stock goods.

Also separate your test budget from your depth budget in the plan. Test money is expected to underperform; depth money should not. Mixing them makes every review meeting a fight about averages instead of a decision about which SKUs to feed.

Certificates affect depth planning more than people think

GRA and IGI paperwork adds a step, and that step has a queue. If a large share of your depth order needs IGI, build that into the calendar. Stone selection and grading can add days on top of the 12 to 18 day production window, so don't plan a depth order for the same week you need it on a shelf.

Frequently Asked Questions

What is the minimum order for synthetic stones wholesale?

Stock items start at 1 piece, so you can test shapes and sizes before committing. Custom production runs at 30 pieces per SKU, with 12 to 18 days for production after spec and deposit are confirmed.

How is pricing set for a six-month plan?

Price is quoted per SKU based on stone grade, size, setting, and certificate type, with volume tiers applied at the depth-order level. We quote against your spec sheet, so the same shape at two grades will carry two different prices.

How long does delivery take once I order?

Stock orders pack quickly and ship DDP in 5 to 8 days to most US and EU addresses. Custom orders run 12 to 18 days in production first, plus the same shipping window, so plan depth orders with that lead time in mind.

If you're building a six-month plan and want real numbers instead of a catalog, send your target SKU list and expected monthly volumes to service@holycome.com or message WhatsApp +86 133 7744 7107. We'll come back with a depth recommendation, sample availability, and a quote broken out by tier so you can see exactly where your cash goes.

Ends ■

Written by the Holycome manufacturing & quality team. Every figure and claim in this article comes from our own production floor in Wuzhou, China — in-house casting, stone setting and a three-pass quality inspection we have run since 2008.

Materials are tested for nickel, lead and cadmium release by SGS and CTT International; moissanite centre stones ship with their GRA warranty card and report. We also hold an independent SMETA / Sedex ethical-trade audit and a Hong Kong Customs AML registration.

Reviewed for accuracy by our quality team before publication. Last updated .

Frequently Asked Questions

Common questions about MOQ, samples, OEM/ODM, production lead time, pricing and payment.

What is the minimum order quantity for wholesale orders?
MOQ starts at 1 piece per style, and mixed styles are welcome for small wholesale batches. Larger private-label and bulk orders are quoted separately under a written agreement.
Can I order a sample before bulk production?
Yes. A sample or prototype is approved first, and bulk production only starts after your written confirmation. Sample lead time is typically 3 to 7 days.
Do you support OEM, ODM and private labeling?
Yes. We support custom designs, private molds, brand packaging and private-label branding for wholesale and retail partners. Send a reference photo or drawing and we return a 3D render and quote.
How long does production and shipping take?
Sampling takes 3 to 7 days, and bulk production is around 15 to 30 days depending on quantity, stone and metal requirements. Express and standard shipping options are quoted with the order.
How are prices and payment arranged?
Quotes are per piece, per carat or per gram based on stone, metal weight, setting and finish. We accept T/T, PayPal and Western Union; custom orders require an agreed deposit with the balance settled before shipment.
cta-row" style="margin-top:40px;"> Inquiry Custom Jewelry