Size Guide Wholesale Guide - HOLYCOME
MOQ, Mixed Designs and the Real First Order
In November, a US independent jewelers and Shopify sellers ordered 480 size Guide and asked for the same lost-wax cast as a competitor's sample. What arrived matched the photo and missed the drawing, and 13 pieces had to be reworked at the buyer's expense.
The defect did not surprise us. prong geometry is the predictable output of a run where nobody wrote the tolerance down, and it is the first measurement we take on an incoming size Guide. It is written into the size Guide spec sheet that travels with the quote, so the bench and the buyer read the same number.
We did not discount the quote. We changed the gauge, the seat cut, the plating log and the tray rule, and the second run shipped with zero rejects on stone retention after a 40-cycle wear test and prong tip height within +/-0.10 mm. It is written into the size Guide spec sheet that travels with the quote, so the bench and the buyer read the same number.
What North American buyers Check Before They Sign
Price is the first thing compared and the last thing that matters. These four measurements decide the return rate on size Guide, and three of them cost nothing to specify. It is written into the size Guide spec sheet that travels with the quote, so the bench and the buyer read the same number.
| Spec point | Common trade output | HOLYCOME standard | Cost if missed |
|---|---|---|---|
| Prong Geometry on size Guide | Inspected visually at the tray | Gauntlet check on every piece, limit written in the spec | Returns inside 60 days of wear |
| Rhodium Burn Off on size Guide | Batch dependent, not logged | Thickness and tension logged per lot | Complaint after the second season |
| Size Step Drift on size Guide | Estimated from nominal | Gauged per size with go/no-go tools | Resize queue and reship cost |
| Tolerance stack-up on size Guide | Quote states nominal only | Worst-case band published per SKU | Freight and duty drift |
None of these are premium features. They cost seconds per piece and they remove the reason a buyer has to inspect twice. It is written into the size Guide spec sheet that travels with the quote, so the bench and the buyer read the same number.
Where USD 38-210 Per Piece Actually Goes
The cost of a size Guide in the USD 38-210 band splits roughly as below. The line buyers challenge most is labor, and it is the line that decides whether the piece survives a season. It is written into the size Guide spec sheet that travels with the quote, so the bench and the buyer read the same number.
| Cost line | Share | What moves it |
|---|---|---|
| Base metal or alloy for size Guide | 34% | Alloy choice and casting yield |
| Stone or melee for size Guide | 25% | Sieve range and lot batching |
| Setting and finishing labor for size Guide | 22% | Jig design and bench minutes |
| Plating, polish and QC for size Guide | 15% | Per-tray versus per-piece checks |
| Packaging and freight for size Guide | 4% | Box grade and DDP versus FOB |
If a supplier will not break out the five lines above, the number you are comparing is not a price. It is a total that somebody else assembled from assumptions. It is written into the size Guide spec sheet that travels with the quote, so the bench and the buyer read the same number.
The Three Failures We See Most in Incoming Samples
prong geometry
A prong that grips the girdle instead of the pavilion survives the showroom and fails the third ultrasonic clean. The seat has to be cut to the pavilion angle before the prongs close.
Our countermeasure is a gauge and a written limit. It adds about 22 seconds per piece and removes the defect from the run rather than from the carton.
rhodium burn-off
A 0.05 micron rhodium layer reads white in the tray and shows yellow at the shank in six months of daily wear. Thickness, not bath chemistry, is the variable that matters.
In a 480-piece run this typically shows on 17 of pieces. Catching it means measuring stone retention after a 40-cycle wear test at the tray level, not inspecting the finished carton.
size-step drift
A run gauged at size 6 and estimated elsewhere ships a size 8 that measures 7.75. The mismatch shows up as a resize queue two weeks after launch.
The commercial effect is a return shipment plus a resize labor claim, typically USD 9-14 per piece. Buyers who have seen it once put it in the purchase order; buyers who have not usually discover it on the first return.
MOQ, Mixed Designs and the Real First Order
Every year we see the same omission in size Guide spec sheets, and every year it costs a buyer a season.
In the US market terms, this is the difference between a landed cost the buyer can plan against and a number that moves after the container ships. For rings, we publish the figure per SKU and hold it for the order window rather than for the calendar year.
Practically, it shows up in three places for rings: the proforma, the QC sheet and the credit note if something goes wrong. All three should quote the same number. When they do not, the argument is about paperwork, not about the product.
How a Repeat Order Gets Built
Our process is deliberately boring, because boring is what survives a bulk run with several sets of hands on it. It is written into the size Guide spec sheet that travels with the quote, so the bench and the buyer read the same number.
- Spec sheet signed before casting: lost-wax cast, tolerances, plating thickness and packing format.
- Sample in 3-5 working days from stock components, or about 20 days if a new model is required.
- Production photos at three checkpoints: raw cast, post-polish, post-set, with buyer approval at each.
- Bulk in 15-20 days under 500 pieces; custom tooling runs 25-30 days.
- Pre-shipment QC report with per-tray counts and a retained reference tray for disputes.
A first order at 50 pieces per design is a measurement rather than a purchase. It tells you what stone retention after a 40-cycle wear test and prong tip height within +/-0.10 mm looks like from this line. It is written into the size Guide spec sheet that travels with the quote, so the bench and the buyer read the same number.
The Sample Approval That Survives Production
This is where size Guide stops being a commodity and starts being a supply relationship.
Three numbers decide it for rings: the tolerance band, the inspection density and the responsibility clause. Write all three down and the rest of the negotiation is arithmetic. Leave any of them out and it becomes a discussion about intent.
We send a one-page sheet with every size Guide quote that states those three, plus the retained-tray rule. Buyers who compare on it usually find that the gap between suppliers is smaller than the gap between the specs they were comparing.
The Reject Tray Policy That Decides a Partnership
On size Guide, the cheapest answer is rarely the cheapest outcome once the second season is counted.
At 480 pieces the arithmetic on rings changes: the fixed costs spread, the variable costs do not. That is why the second order prices better than the first even when the gold fix has moved up.
We quote both a first-run price and a reorder price for size Guide on the same sheet so the buyer can see where the curve flattens. Most flatten by the third run.
Carton Cube, Duty and the Freight Line That Surprises Buyers
Most quotes for size Guide describe the product and skip the part that decides whether the buyer makes money.
The commercial version of this question for rings is simple: what does a failure cost the buyer, and who pays it. In our terms the answer is a replacement inside the same order cycle, with the retained reference tray as the arbiter.
That clause matters more than a discount on rings. A 4% lower unit price disappears on the first rejected tray; a written responsibility clause does not.
What This Means for a First Order
A test run at 50 pieces tells you three things: whether prong geometry is controlled, whether packing survives freight, and whether the count is honest. It is written into the size Guide spec sheet that travels with the quote, so the bench and the buyer read the same number.
Buyers who run that measurement before committing a season usually keep the supplier. Buyers who skip it usually pay twice for the same lesson. It is written into the size Guide spec sheet that travels with the quote, so the bench and the buyer read the same number.
Freight, Duty and the Arrival Check
We ship from Guangzhou or Shenzhen, and the port choice follows the carrier rate rather than a fixed habit. It is written into the size Guide spec sheet that travels with the quote, so the bench and the buyer read the same number.
DDP is available for US accounts that want duty and clearance on our side, and it removes the invoice that arrives after the carton clears. It is written into the size Guide spec sheet that travels with the quote, so the bench and the buyer read the same number.
On arrival, weigh a tray and measure ten pieces. Anything outside the band is a claim with evidence rather than a difference of opinion. It is written into the size Guide spec sheet that travels with the quote, so the bench and the buyer read the same number.
Frequently Asked Questions
What is the minimum order for size Guide?
50 pieces per size Guide. Designs mix inside one shipment, so a first order of three designs at 50 pieces each is normal for a new US account. Below 50 we cannot keep the gauge check independent of the shift, which is the part buyers actually pay for on size Guide.
How long does a reorder of the same size Guide take?
12-15 days for size Guide, because the model, the gauge set and the signed spec stay in our system. A first run is longer: 3-5 days for a stock-component sample, about 20 days if a new model is needed, then 15-20 days for bulk under 500 pieces.
Do you supply certificates for size Guide?
IGI or GRA above 0.50 ct for size Guide. Below that threshold we supply a batch report plus per-piece measurement of stone retention after a 40-cycle wear test, which is what most resellers need at the counter.
What finish do you use on size Guide, and how thick is it?
Rhodium at 0.20 micron minimum on white size Guide, with a palladium strike layer so wear-through reads white rather than yellow. Thickness is logged per lot and appears on the QC sheet, not only in the brochure.
How do you handle a rejected tray of size Guide?
We replace or credit inside the same order cycle. The retained reference tray decides: if prong geometry shows on our retained size Guide we own it, and if it appeared in transit we split the assay cost and file with the carrier. A typical exposure on size Guide is a return shipment plus a resize labor claim, typically USD 9-14 per piece.
Next Step
If you are quoting size Guide against another supplier, send that quote. We will mark the four lines where the numbers diverge and let you decide. It is written into the size Guide spec sheet that travels with the quote, so the bench and the buyer read the same number.
The factory behind size Guide here is Wuzhou HengliLai Jewelry Co., Ltd., operating since 2009 in Wuzhou, Guangxi, at roughly 60,000 pieces a month. Reach the export desk at service@holycome.com or +86 133 7744 7107 on WhatsApp.
Related reading: Moissanite Value Wholesale: Sample to Container: The Real Calendar - HOLYCOME Earrings Value Value: Alloy, Karat and the Cost of a Color Change - HOLYCOME